The northbound span of the Interstate Bridge, that crosses the Columbia River from Portland, Oregon to Vancouver, Washington, will close Sept. 19-27, 2020 to replace mechanical parts that help lift and lower the bridge. The southbound span will remain open to traffic in both directions; travelers will share the three open lanes.

Heavy traffic, congestion, and long delays are expected in the region during construction, as well as days prior and following. For more information, follow the link below.

Read More
< Back To Previous

Esther Westpark Community Room

  • 610 Esther Street, Vancouver, WA 98660
  • Region: Downtown/Uptown Vancouver
  • Phone: 360-798-6261
Facility Info
  • Total Sq. Ft. 875
  • Reception Capacity 100
  • Space Notes With inclusion of the outdoor terrace, the total square footage is 1800 and the reception capacity increases to 200. Other amenities include: gas firepit and water feature in attached courtyard, state of the art multi-media presentation equipment (including a flat screen television and free wifi), full sink and wine refrigerator.
  • Theatre Capacity 80
  • Banquet Capacity 70
  • Classroom Capacity 50