The northbound span of the Interstate Bridge, that crosses the Columbia River from Portland, Oregon to Vancouver, Washington, will close Sept. 19-27, 2020 to replace mechanical parts that help lift and lower the bridge. The southbound span will remain open to traffic in both directions; travelers will share the three open lanes.

Heavy traffic, congestion, and long delays are expected in the region during construction, as well as days prior and following. For more information, follow the link below.

Read More
< Back To Previous

Camas Meadows Golf Club

Facility Info
Meeting Rooms
  • Largest Room 3200
  • Reception Capacity 250
  • Number of Rooms 5
Oak Ballroom
  • Total Sq. Ft.: 2520
  • Width: 56
  • Length: 45
  • Reception Capacity: 175
White Oak
  • Total Sq. Ft.: 1215
  • Width: 27
  • Length: 45
  • Reception Capacity: 60
Red Oak
  • Total Sq. Ft.: 1305
  • Width: 29
  • Length: 45
  • Reception Capacity: 60
Tent (seasonal)
  • Total Sq. Ft.: 3200
  • Width: 80
  • Length: 40
  • Reception Capacity: 250
Lower Terrace
  • Total Sq. Ft.: 2000
  • Reception Capacity: 150