The northbound span of the Interstate Bridge, that crosses the Columbia River from Portland, Oregon to Vancouver, Washington, will close Sept. 19-27, 2020 to replace mechanical parts that help lift and lower the bridge. The southbound span will remain open to traffic in both directions; travelers will share the three open lanes.

Heavy traffic, congestion, and long delays are expected in the region during construction, as well as days prior and following. For more information, follow the link below.

Read More
< Back To Previous

Brickstone Ballroom

  • 916 Main St, Vancouver, WA 98660
  • Region: Downtown/Uptown Vancouver
  • Phone: (360) 852-0813
Facility Info
  • Reception Capacity 200
  • Space Notes ADA Accessible, separate bride and groom rooms, prep kitchen, stage and dance floor, basic sound system, tables and chairs.
  • Theatre Capacity 170
  • Banquet Capacity 120
  • Number of Rooms 1