The northbound span of the Interstate Bridge, that crosses the Columbia River from Portland, Oregon to Vancouver, Washington, will close Sept. 19-27, 2020 to replace mechanical parts that help lift and lower the bridge. The southbound span will remain open to traffic in both directions; travelers will share the three open lanes.

Heavy traffic, congestion, and long delays are expected in the region during construction, as well as days prior and following. For more information, follow the link below.

Read More
< Back To Previous

Artillery Barracks at Fort Vancouver

  • 600 E Hatheway, Vancouver, WA 98661
  • Region: Downtown/Uptown Vancouver
  • Phone: (360) 828-5237
Facility Info
Meeting Rooms
  • Floorplan File Floorplan File
  • Largest Room 3266
  • Theatre Capacity 140
  • Banquet Capacity 125
  • Number of Rooms 3
Board Room
  • Classroom Capacity: 30
Conference Room
  • Reception Capacity: 140
Banquet Room
  • Banquet Capacity: 125